Canal Silt Clearing

Works carried out by Exepaint Ltd on behalf of DCC. The Upstream sump had a depth of 4.5 mts whilst the Downstream sump was 2.5 mts deep. The culvert beneath the Canal measures 30mts in length with a diameter of 1.2 mts.
A pump was running continuously to remove the incoming water.